The Scheme Bharmour - I Hydro Electric Project is conceived as a run-off the river scheme for generation of 24.0MW (3X8MW) hydro power on Budhil Nala, a tributary of Ravi River.

The main components of the Scheme as planned are:
1. Barrage cum Intake
2. Feeder Channel
3. De silting Chamber
4. Head Race Tunnel
5. Surge Shaft
6. Steel lined Pressure Shaft trifurcating in to 3 nos of penstock near power house
7. Surface Power House to accommodate 3 units of 8MW each to generate power including Service Bay,
   Control Room etc.
8. Tail Race Pool
9. Switch Yard
10. Transmission line